Challenges Designing an Underground High Voltage AC Transmission Line in Brazil’s Largest City
by Jody Fujihara
by Jody Fujihara
São Paulo is one of the most densely populated metropolitan regions in Latin America and presented extreme challenges for deployment of high-voltage infrastructure due to saturation of urban space, complexity of existing underground utilities, and unavailability of rights-of-way for overhead transmission.







