Transmission line surge arresters (TLSAs) are applied on overhead lines to improve outage performance and, particularly in the case of EHV, also to limit the magnitude of switching overvoltages. There are two basic types: externally gapped line arresters (EGLAs) and non-gapped line arresters (NGLAs). In some countries, such as the United States, most transmission line arresters are NGLA type. This past INMR article summarized the findings of multi-year research by EPRI whose goal was to understand the causes of lead breakages on NGLAs with a view of formulating functional requirements that could be included in user technical specifications.


NGLAs are comprised of a column of metal oxide varistors (MOVs), reinforced by fiberglass straps or loops and packaged in a polymeric housing. These arresters are installed between phase conductor and tower employing connection leads. One end of the arrester is typically fitted with a disconnector to break the connection in the event of failure.

Installation configurations can be classified into one of three broad groups:

• Mounted onto tower or hung from cross-arm;
• Hung from conductor;
• Installed parallel to line insulator as part of insulator assembly.

Service experience has demonstrated that, from an electrical standpoint, application of NGLAs often improves line performance with relatively few failures. At the same time, however, utilities report that NGLA installations can sometimes be compromised by mechanical issues, such as failure of the connection lead or disconnector. Arrester standards at the moment do not include tests or requirements for the connections although a proposed revision of IEC 60099-5 does provide some information on mechanical loading of the leads. Both IEC 60099-5 standard and Cigré Brochure #440 acknowledge the connection lead as an important weakness in present designs that warrants careful consideration.  

Typical NGLA installation where arrester is attached directly to transmission line support structure. line arrester Mitigating Lead Stresses on Line Arresters Screen Shot 2016 01 22 at 11
Fig. 1: Typical NGLA installation where arrester is attached directly to transmission line support structure.
CLICK TO ENLARGE

 Typical Installation Problems with NGLA Applications

EPRI actively collects service experience from member utilities and manages a database of failure reports from line inspections. A summary of typical installation problems found during such inspections is then provided for each different installation configuration.

1. Mounted onto tower or hung from cross-arm

A popular method for installing an NGLA is to hang it from the cross-arm of the line structure or to mount it on the structure with a lead connecting the live side of the arrester to the phase conductor. An overview of a typical such installation is shown in Fig. 1. Examples of common installation errors observed during line inspections are given in Table 1.

Table 1: Typical Installation Issues for NGLAs Mounted onto Tower or Hung from Cross-arm

Comments Example
1)  An example of angled arrester application that does not account for conductor movement. Under windy conditions, TLSA may be subjected to compression or tensile forces caused by swinging motion of conductor. This can lead to mechanical or electrical failure of TLSA. An example of angled arrester application  line arrester Mitigating Lead Stresses on Line Arresters Screen Shot 2016 01 22 at 11
2)  TLSA is installed too close to insulator assembly, resulting in under clearance condition when arrester becomes disconnected. There is also possibility that insulator assembly may come into contact with TLSA when conductor swings inwards.

3)  Disconnector installed on arrester end of connection lead. Lead will therefore hang down from energized conductor if disconnector operates and become possible source of corona and radio or TV interference.

2TLSA is installed too close to insulator assembly line arrester Mitigating Lead Stresses on Line Arresters Screen Shot 2016 01 22 at 11
4)  Example of lead stub on energized conductor after TLSA was disconnected. This is potential source of corona and interference and can be avoided by placing disconnector as close as possible to energized conductor. Example of lead stub on energized conductor after TLSA was disconnected. line arrester Mitigating Lead Stresses on Line Arresters Screen Shot 2016 01 22 at 11
For this angled TLSA installation, a rigid connection lead is used. This may cause following problems:
Advertisement
line arrester Mitigating Lead Stresses on Line Arresters CSL Advertisement e1477326535980

5) Lead will be subjected to bending forces during conductor movement that may result in lead failure due to metal fatigue.

6) Disconnector installed on arrester end of connection lead. Lead will therefore hang down from energized conductor if disconnector operates and become possible source of corona and radio or TV interference.

7) If TLSA disconnects it will hang vertically. Arrester lead, due to its rigidness, will protrude into air gap, possibly resulting in reduced electrical clearance. A flexible lead, by contrast, would hang down and provide a much larger electrical clearance between TLSA and energized conductor.

5) Lead will be subjected to bending forces during conductor movement line arrester Mitigating Lead Stresses on Line Arresters Screen Shot 2016 01 22 at 11
8)  Angled TLSA installation and arrester connection lead is under dynamic and static mechanical loading. Service experience shows that thin leads (as shown in photo) may not be durable. Use of chain with intertwined lead to bear mechanical forces for electrical connection may provide more reliable solution. Angled TLSA installation and arrester connection lead is under dynamic and static mechanical loading line arrester Mitigating Lead Stresses on Line Arresters Screen Shot 2016 01 22 at 11
9) Example where chain and flexible lead combination is used as connection lead. Here, chain connection bypasses disconnector, rendering it ineffective. Both chain and electrical lead should terminate on disconnector. chain connection bypasses disconnector, rendering it ineffective line arrester Mitigating Lead Stresses on Line Arresters Screen Shot 2016 01 22 at 11

2. Hung from phase conductor

Advertisement
BPG International Advertisement line arrester Mitigating Lead Stresses on Line Arresters BPG logo

NGLAs can also be applied on phase conductors, with the connection lead between the base of the arrester and the grounded support structure. An example of a typical such installation is shown in Fig. 2.

In recent publications, INMR Columnist and expert, William Chisholm, pointed out that several mechanical interactions need to be considered when installing arresters directly onto phase conductors. These include: (1) pendulum frequencies to avoid mechanical resonance; (2) effect on performance of vibration dampers due to arrester weight on conductor; and, (3) introduction of vibration tests for clamps used to mount arresters.

3. Installed parallel to line insulator as part of insulator assembly

A number of arrester manufacturers offer options for installing a surge arrester in parallel to the insulator as part of the insulator assembly. Here, the arrester is attached with short connections to the insulator’s end fittings or associated hardware, as shown in Fig. 3.

Fig. 2: Typical NGLA installation where arrester is hung from phase conductor. line arrester Mitigating Lead Stresses on Line Arresters Screen Shot 2016 01 22 at 11
Fig. 2: Typical NGLA installation where arrester is hung from phase conductor.
CLICK TO ENLARGE

 

Advertisement
line arrester Mitigating Lead Stresses on Line Arresters INTEGRATED Engineering Software Mar 11
installation where arrester is installed parallel to line insulator as part of insulator assembly. line arrester Mitigating Lead Stresses on Line Arresters Screen Shot 2016 01 22 at 11
Fig. 3: NGLA installation where arrester is installed parallel to line insulator as part of insulator assembly.
CLICK TO ENLARGE

 

 

 

 

 

 

 

 

 

 

 

This type of installation requires substantial pre-engineering due to the proximity of the TLSA to the insulator. Consequently, relatively few problems are experienced if installed correctly. A weakness of this installation design, however, is that the attachment method and connections need to be optimized for each different type of insulator assembly (i.e. model, length, type of end fitting, etc.). There is therefore a risk that some arresters could end up being installed on incompatible insulators assemblies, resulting in either loose-fitting arresters or arresters attached to inappropriate parts of the insulator. This could result in damage to the arrester and/or insulator.

Poor attachment point between line insulator and installed NGLA. In this example, energized end of arrester is clamped to insulator housing material, causing severe erosion and possible mechanical damage to polymeric insulator. line arrester Mitigating Lead Stresses on Line Arresters Screen Shot 2016 01 22 at 11
Poor attachment point between line insulator and installed NGLA. In this example, energized end of arrester is clamped to insulator housing material, causing severe erosion and possible mechanical damage to polymeric insulator.
CLICK TO ENLARGE

Another potential problem occurs when surge arresters are installed in a horizontal orientation or at an angle to vertical. In such cases, the weight of the arresters (especially for long units) can be significant and has to be considered. Depending on length, bowing could occur along the unit.

Advertisement
Yizumi Ad line arrester Mitigating Lead Stresses on Line Arresters INMR YIZUMI July edition
Example of bending through of horizontally installed NGLA. Such bending can affect electrical connections between individual metal oxide, non-linear resistor blocks. It could also impact integrity of sealing of polymeric housing. line arrester Mitigating Lead Stresses on Line Arresters Screen Shot 2016 01 22 at 11
Example of bending through of horizontally installed NGLA. Such bending can affect electrical connections between individual metal oxide, non-linear resistor blocks. It could also impact integrity of sealing of polymeric housing.
CLICK TO ENLARGE

Testing Connection Leads

Based on the service experience discussed above, it is clear that many of the failures observed in service are caused by broken connection leads. TLSA installations should therefore be designed to minimize mechanical stress on the connection lead and disconnector since these components – especially the disconnector – are unable to tolerate high mechanical loads. Other mechanical design considerations include:

• Connections should allow free movement of phase conductors, which could take the form of conductor swing, aeolian vibrations, galloping and sub-span oscillations;
• Connections and associated hardware should withstand all mechanical forces they are subjected to;
• Connections should be durable so as to withstand fatigue due to movement;
• Installation and connections should not place excessive mechanical loading on the arrester or disconnector attachments;
• Disconnection of the arrester should occur in a controlled manner, without consequential damage to it or other equipment.

Connection Leads

Lead wires are used to connect arrester units either to the phase conductor or to a grounded part of the line support structure. There are generally two types of lead configurations:

Example of typical TLSA connection lead fitted with lugs. line arrester Mitigating Lead Stresses on Line Arresters Screen Shot 2016 01 22 at 11
Example of typical TLSA connection lead fitted with lugs.
CLICK TO ENLARGE

1. Flexible rope type wires with crimped lug connectors are used in applications where the lead is not subjected to high mechanical loads;

Advertisement
Desma Advertisement line arrester Mitigating Lead Stresses on Line Arresters Desma banner Apr 26

2. Chain intertwined with the lead wire has been used with success in cases where significant mechanical loads are expected.

Since the primary function of the leads are to establish an electrical connection, they should be designed to carry (1) low magnitudes of continuous current flowing through the arrester during normal operation; (2) high impulse discharge currents when the arrester conducts a surge; and (3) power frequency fault current should the arrester fail. The lead also implicitly establishes a mechanical connection and therefore it is necessary to consider such forces when designing the lead attachment.

Two types of leads are typically used on NGLA applications and their function is slightly different. One should be able to isolate the arrester should it fail. This lead typically comprises a flexible lead in series with the disconnector, which is designed to operate when the arrester fails. The other connection is typically much shorter and serves to electrically bypass mechanical joints that can have a high electrical contact resistance and cause sparking. These bridging leads also protect the mechanical support from damage due to high discharge or fault currents.

Observed TLSA Connection Lead Failures

Examples of common lead failures include:

• The lead wire pulling out of the lug. This is a common problem possibly the result of a mechanical overload or poor crimping of the lead connection;
• The edge of the crimped lug ‘sawing’ into the lead conductor, severing strands and weakening the lead mechanically. This can occur when a mechanically loaded lead is not well aligned with the lug;
• Wearing down of the lead in chain connections (where it is woven through the chain) due to continual movement.

line arrester line arrester Mitigating Lead Stresses on Line Arresters Screen Shot 2016 01 22 at 11
Examples of typical lead failures on TLSAs.
CLICK TO ENLARGE

Testing Now Performed at EPRI

Current standards do not provide specific guidance on applying line arresters and no mechanical tests for leads are prescribed. As a first step to address such ommissions, EPRI developed a simulated field test to quantify typical in-service mechanical lead loads under different environmental conditions. The test measures mechanical loading of the arrester as well as leads under real-world conditions and any degradation of components is recorded. It is hoped that this information will provide for a better understanding of lead loads and also a technical basis for future laboratory testing.

Instrumenting an energized installation was not considered cost-effective since only the mechanical forces in the lead are of interest. Three typical arrester configurations were therefore installed on a de-energized test line at the EPRI facility in Lenox, Massachusetts. The site was commissioned in January 2015 and is expected to run for at least 18 months to obtain meaningful results. Mechanical loads in the leads are monitored continuously but only the maximum load over a 2-minute interval is logged. Special considerations have been taken to ensure that load cells and their added weight do not themselves influence loads on the leads.

Arrester installation at EPRI in Lenox. line arrester Mitigating Lead Stresses on Line Arresters Screen Shot 2016 01 22 at 11
Arrester installation at EPRI in Lenox.
CLICK TO ENLARGE

A weather station is used to reconcile the impact of the outdoor environment during testing and is backed up by a second nearby logging weather station attached to a mast. The most important parameter – wind speed – is monitored with a 2-D ultrasonic type anemometer, which has no moving parts to wear out or to introduce errors from drag. Ultrasonic anemometers have the additional advantage of more accurately measuring low wind speeds compared to mechanical types.

Conclusions

Non-gapped line arresters (NGLAs) are applied to improve the lightning performance of transmission lines. While these arresters perform well electrically, their installation is often compromised by failures of the connection leads or disconnector. Service experience has shown that a major part of such failures can be ascribed to installation related issues. Often, the connections between the arrester and energized conductor or between the arrester and grounded structure are subject to static or dynamic loads. These loads could cause fatigue or overloading, resulting in broken connections or other damage to the arrester. Since present test standards do not address requirements for connecting leads on arresters, EPRI has developed an approach using mechanical measurement combined with testing in order to better understand these issues.